Drywall Talk - Professional Drywall and Finishing Contractors Forum
CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Go Back   Drywall Talk - Professional Drywall and Finishing Contractors Forum > Drywall Talk > Hanging Drywall

Reply
 
Thread Tools Display Modes
Old 07-02-2009, 10:27 PM   #21
Member
 
Join Date: Jul 2009
Location: pennsylvania
Posts: 79
Default

there was a time many many moons ago that I was working union and we were doing strait eight apartments. All eight foot stand ups. We had a fifty sheet a day quota or they had your money. Anything over fifty was $5 a board cash in the envelope at the end of the week. I had four months of 120 sheets a day six days a week.
rockdaddy is offline   Reply With Quote
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DrywallTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper saftey precaution and reference reliable outside sources before attempting any construction or remodeling task!
Old 07-02-2009, 10:28 PM   #22
Member
 
Join Date: Jul 2009
Location: pennsylvania
Posts: 79
Default

I have a eight man gang that will do 300 sheets with corner bead in 9 hours. 10 if they scrap it.
rockdaddy is offline   Reply With Quote
Old 07-02-2009, 10:33 PM   #23
Member
 
Join Date: Jul 2009
Location: pennsylvania
Posts: 79
Default

A good, man on a residential job on wood should be doing 40-45 a day per man. Commercial standups on metal no topping out, screwed off should be doing 50-75 per day on strait runs and loading his cart.
rockdaddy is offline   Reply With Quote
Old 07-02-2009, 11:34 PM   #24
Super Moderator
 
Darren@Partners's Avatar
 
Join Date: Dec 2008
Location: KCMO area
Posts: 758
Default

Quote:
Originally Posted by rockdaddy View Post
there was a time many many moons ago that I was working union and we were doing strait eight apartments. All eight foot stand ups. We had a fifty sheet a day quota or they had your money. Anything over fifty was $5 a board cash in the envelope at the end of the week. I had four months of 120 sheets a day six days a week.
Here the union has a 30 sheet MAXIMUM per day.
Darren@Partners is offline   Reply With Quote
Old 07-03-2009, 02:01 AM   #25
Senior Member
 
Join Date: Jan 2009
Location: Twin Cities Mn
Posts: 910
Send a message via Skype™ to Whitey97
Default

Quote:
Originally Posted by rockdaddy View Post
I have a eight man gang that will do 300 sheets with corner bead in 9 hours. 10 if they scrap it.
yeah, but do they speak any english?
Whitey97 is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off

Similar Threads
Thread Thread Starter Forum Replies Last Post
Please clarify this "per sheet" business Bevelation Drywall Finishing 55 10-10-2009 06:24 PM

Top of Page | View New Posts

All times are GMT -4. The time now is 11:33 PM.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.2.0
Drywall Talk © 2007 - 2008 The Building Network LLC