5' radius arch w/ 5/8 Exterior Gyp
Anyone out there have any ideas for hanging a 5' rad. arch w/ 5/8 Exterior gyp? Tried 6" rips soaked in water bath but they just broke. Specs call for Ext gyp w/ 1" foam and Drivit over. Any substitution must be GC /Arch. approved. It's on entryway 16' up. Back cutting might work but afraid the board would peel trying to get it up the scaffold.
|
|
|
|
|
|
#2 |
|
All American Drywall,Inc.
Trade: finisher, drywall contractor 22 yrs.
Join Date: Oct 2008
Location: Central Florida
Posts: 31
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: 5' radius arch w/ 5/8 Exterior Gyp
try leaning the board on a wall on end, with no water for a day or two. it will bow
Chris Last edited by ThatDrywallGuy; 01-22-2009 at 07:01 PM. |
|
|
|
|
|
#3 |
|
Senior Member
Trade: drywaller/taper/texturer
Join Date: Apr 2008
Location: brandon manitoba canada
Posts: 222
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: 5' radius arch w/ 5/8 Exterior Gyp
curious as to how you made out darren did you end up using 5/8 exterior or did general contractor allow an alternative, i probably would have back cut and got a spare set of hands for install,don't know if i would have had the patience for the leaning for a day or two method, but probably would have worked.
|
|
|
|
|
|
#4 |
|
Super Moderator
Trade: Drywall Contractor / Hanger
Join Date: Dec 2008
Location: KCMO area
Posts: 904
Thanks: 0
Thanked 35 Times in 23 Posts
|
Re: 5' radius arch w/ 5/8 Exterior Gyp
Outside temp 13 F. Rips cut for job in solid block of ice. On hold until better weather. Still waiting for alternatives from USG rep. (emailed 1/22, no reply). Will probably build a form indoors unless given another option. Going to eat a lot of labor that way. Figure if I wait until EIFS shows up, GC will let me use 3 layers 1/4 hi-flex to complete. Keep you posted.
|
|
|
|
|
|
#5 | |
|
Senior Member
Trade: Drywall
Join Date: Oct 2008
Posts: 421
Thanks: 4
Thanked 9 Times in 7 Posts
|
Re: 5' radius arch w/ 5/8 Exterior GypQuote:
|
|
|
|
|
|
|
#6 |
|
Super Moderator
Trade: Drywall Contractor / Hanger
Join Date: Dec 2008
Location: KCMO area
Posts: 904
Thanks: 0
Thanked 35 Times in 23 Posts
|
Re: 5' radius arch w/ 5/8 Exterior Gyp
oops
Last edited by Darren@Partners; 03-10-2009 at 10:20 AM. |
|
|
|
|
|
#7 |
|
Super Moderator
Trade: Drywall Contractor / Hanger
Join Date: Dec 2008
Location: KCMO area
Posts: 904
Thanks: 0
Thanked 35 Times in 23 Posts
|
Re: 5' radius arch w/ 5/8 Exterior Gyp
It all went back to me standing up to the GC/Architect on the whole Level 4 spec deal. A**holes even made us put 5/8" filler strips in at bottom of int. walls so VCT installer would cry. Job is now complete and GC/Arch are off to another batch of subs to sportf***. And no USG never contacted me.
|
|
|
|
|
|
#8 |
|
The Drywall King!
Trade: Drywall Contractor - Frame-Finish
Join Date: Jun 2008
Location: Miami, FL
Posts: 649
Thanks: 25
Thanked 46 Times in 32 Posts
|
Re: 5' radius arch w/ 5/8 Exterior Gyp
3 layers of flexible 1/4" ?
|
|
|
|
|
|
#9 |
|
Super Moderator
Trade: Drywall Contractor / Hanger
Join Date: Dec 2008
Location: KCMO area
Posts: 904
Thanks: 0
Thanked 35 Times in 23 Posts
|
Re: 5' radius arch w/ 5/8 Exterior Gyp
Yeh, my first thought but the specs wouldn't allow. We get er done by back-cutting smaller pieces.
|
|
|
|
|
|
#10 |
|
Senior Member
Trade: Plaster/Drywall/Painting
Join Date: Aug 2008
Location: S.E. Michigan
Posts: 112
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: 5' radius arch w/ 5/8 Exterior Gyp
That's a bitch, but why not back cut every inch across the board, it will hold it's shape intill you place it, your gonna need three guys to press it up in place, use glue then screw it down, otherwise what about wire lath and brown coat and plaster?
www.frankawitz.net |
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Arch troubles | lloyd.116 | Drywall Finishing | 25 | 04-06-2008 02:47 AM |
| Go to Page... |