Yep, emphasize QUALITY. But also seeing that these hacks can't turn out a top-quality job at the same speed we can. I usually figure (give or take) a day per 1000 bd ft. Seeing some of these guys take 3-4 weeks to do a job we coulda ko'd in 9-11 days.

And rest assured, some of these builders/GCs will get to pay for using those hacks. When these low-ballers don't pay the supply house and then they'll get that lien/bill dropped on 'em. It won't be such a bargain then....

Darren@Partners is offline  
Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DrywallTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Old 05-31-2009, 04:06 PM   #22
Senior Member
 
Custom Drywall Svc.'s Avatar
 
Trade: Drywall
Join Date: Oct 2008
Posts: 421
Thanks: 4
Thanked 9 Times in 7 Posts
Default

Re: Job Poll


Quote:
Originally Posted by Darren@Partners View Post
Yep, emphasize QUALITY. But also seeing that these hacks can't turn out a top-quality job at the same speed we can. I usually figure (give or take) a day per 1000 bd ft. Seeing some of these guys take 3-4 weeks to do a job we coulda ko'd in 9-11 days.

And rest assured, some of these builders/GCs will get to pay for using those hacks. When these low-ballers don't pay the supply house and then they'll get that lien/bill dropped on 'em. It won't be such a bargain then....

oh yea.....they WILL and ARE eventually getting what they paid for. The kicker with drywall is that issues can stay non-existent until months to a year later, we all know this.

im already hearing how some of my DISLOYAL GC's (thru their own employees) are having drywall issues now with some of these new drywall subs (hacks).

I already have one builder coming BACK to me after using a hack that beat me on the last house by 40%. he found out these hacks were doing nearly a level 3 (barely) before spraying....and all the work looks like complete sh-t now.

the builder even had me look at the house, it just looked like crap. sloppy as hell. they had 9' clngs, and i ask the builder 'why didnt you tell these guys to use 54" board instead of regular 4 x 12s?'

he tells me: "well, i told them to use the 54" board....but they told me how its more expensive, and their drywall contract didnt include that"

......sigh. hahahhahhahaha....
Custom Drywall Svc. is offline  
Old 07-03-2009, 11:41 PM   #23
Senior Member
 
rockdaddy's Avatar
 
Trade: drywall installs
Join Date: Jul 2009
Location: pennsylvania
Posts: 105
Thanks: 0
Thanked 2 Times in 2 Posts
Default

Re: Job Poll


Homeowners and spot lots get paid in installments. 50% the day prior to the load. 25%w= when the hangers are done 15% when the tapers are done and the balance after the touch up. Reason being that you dont know them they dont know you. Its a fair arrangement where things are paid in phases and the wheels stay greased. I like the builders who pay in two weeks. Thats a fair time to me for waiting. Gives them time to get it trimmed and painted and see how everything looks. Big builders and nationals get thirty to forty five days in exchange for volume.
Always good business when you keep money coming in. Cant go wrong.
rockdaddy is offline  
Old 07-10-2009, 04:43 AM   #24
Member
 
rabb's Avatar
 
Trade: TAPER
Join Date: Mar 2008
Posts: 46
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Re: Job Poll


Quote:
Originally Posted by rockdaddy View Post
Homeowners and spot lots get paid in installments. 50% the day prior to the load. 25%w= when the hangers are done 15% when the tapers are done and the balance after the touch up. Reason being that you dont know them they dont know you. Its a fair arrangement where things are paid in phases and the wheels stay greased. I like the builders who pay in two weeks. Thats a fair time to me for waiting. Gives them time to get it trimmed and painted and see how everything looks. Big builders and nationals get thirty to forty five days in exchange for volume.
Always good business when you keep money coming in. Cant go wrong.
good post
rabb is offline  


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Join Now... It's Fast and FREE!

Privacy Badge
I am a professional contractor
I am a DIY Homeowner
ContractorTalk.com is for
PROFESSIONAL CONTRACTORS ONLY!

At ContractorTalk.com we cater exlusivly to professional contractors who make their living as a contractor. Knowing that many homeowners and DIYers are looking for a community to call home, we've created www.DIYChatroom.com DIY Chatroom is full of helpful advices and perfect for DIY homeowners.

Redirecing in 10 seconds
No Thanks
terms of service

Already Have an Account?


SEO by vBSEO 3.6.0