|
|
Thread Tools | Display Modes |
|
|
#1 |
|
Sheetrock Doc
Trade: Hangin' & Finishin'
Join Date: Mar 2008
Location: Midwest
Posts: 8
Thanks: 0
Thanked 0 Times in 0 Posts
|
Going rates.....
Ive read so many good posts here I had to join.Just wondering what prices for hanging and finishing are elsewhere.We start @ 50 cents a foot w/knock down ceilings. Is this above, below, or what ?
|
|
|
|
|
|
#2 |
|
Junior Member
Trade: Handyman
Join Date: Mar 2008
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
what is the going rate to hang drywall in a garage, in Laguna Niguel, Ca?
|
|
|
|
|
|
#3 |
|
Sheetrock Doc
Trade: Hangin' & Finishin'
Join Date: Mar 2008
Location: Midwest
Posts: 8
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
When I lived in San Clemente, it was 6.5 cents a foot.Thats been awhile ago...1976.Hope its gone up a lil since then for ya !
|
|
|
|
|
|
#4 |
|
Member
Trade: Taping and Texturing
Join Date: Apr 2008
Posts: 61
Thanks: 0
Thanked 1 Time in 1 Post
|
Re: Going rates.....
About 55 cents for me, hang, tape, prime, orange peel walls and daub ceilings, and materials.
|
|
|
|
|
|
#5 |
|
Junior Member
Trade: Hanger, Stocker
Join Date: Feb 2008
Posts: 2
Thanks: 0
Thanked 1 Time in 1 Post
|
Re: Going rates.....
For hanging I get .25 for base, never lower, and up to .64 in the Club so anywhere in there I guess depending on the project
|
|
|
|
|
|
#6 |
|
Senior Member
Trade: drywaller/taper/texturer
Join Date: Apr 2008
Location: brandon manitoba canada
Posts: 222
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
hanging .25 on total board footage, taping .60 on total board footage, knockdown texture .45 on the ceiling board footage.
|
|
|
|
|
|
#7 |
|
Sales Manager
|
Re: Going rates.....
I would say that I probably get anywhere from .45 to .65 per sqft depending on volume.(labor only)
|
|
|
|
|
|
#8 |
|
Member
Trade: Taping and Texturing
Join Date: Apr 2008
Posts: 61
Thanks: 0
Thanked 1 Time in 1 Post
|
Re: Going rates.....
Yeah.... Kind of hard to compare on this subject unless we know the difference of cost of living for people on this board...
Where I am from the average household income is only in the mid 30s and the average home price is around $165k... |
|
|
|
|
|
#9 |
|
Mud Manipulator
Trade: Drywall Finishing
Join Date: Dec 2007
Location: Sherwood Park, AB
Posts: 220
Thanks: 38
Thanked 35 Times in 23 Posts
|
Re: Going rates.....
Good point Cooper. Here we get gouged $400 000 for a simple cookie cutter house. A loaf of bread costs $4.00. Even the homes that were built 50 years ago are going for $ 350 000.
|
|
|
|
|
|
#10 |
|
Junior Member
Trade: commercial drywall finishing
Join Date: May 2008
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
Hello, I need help with pricing a job. This is residential and not sure what is fair. It is about a 1600 sq ft house, picture framed 15 windows. I only finished the job, somebody else hung the drywall. They did a aweful job, butt joints like crazy, used 8ft board everywhere. I also primed, painted the whole house, trim, doors, everything. Could somebody give me any suggestions.
|
|
|
|
|
|
#11 |
|
Lic. GC & D/W
Trade: Cut it big & kick it till it fits
Join Date: Nov 2007
Location: New England, USA
Posts: 46
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
We charge per job type.
Bare in mind that these are rates in New England. Remodeling: $1.50/SF to $2.00/SF New construction: $1.00/SF That's hang & tape with materials. Don't ask me about pricing seperately or labor only, because we always supply both L&M...
__________________
screw it |
|
|
|
|
|
#12 |
|
Commercial Contractor
|
Re: Going rates.....
I am same as AtlanticWB, always supply material.
I get: $55.00/board or 1.14/sqft up to $90.00/board or 1.87/sqft All this based on 4x12, all stood up. Includes furnishing materials, hang, bead, scrap, tape, block, skim, sand, point up, scrape floors. Thats all new construction, retro fits & remod's are more. I also add extra for scaffold erection. Last edited by Mud Master; 05-08-2008 at 06:26 AM. |
|
|
|
|
|
#13 |
|
Craftsman
Trade: Drywall taper & finisher / Painter & Decorator
Join Date: May 2008
Location: Scotland
Posts: 26
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
In Scotland the going rate for taping is between £3.25 to £3.50 a sq metre - That's around $6.50 to $7.00. 1 sq metre = 10.763 sq ft. Plus the same rate per linear foot on top for external corners. That's just to the sanding stage and supplying all materials.
So that works out at around 60c/65c a sq ft. Texturing is extra @ around the same price. If ceilings are higher than 8ft then the rate goes up a little, depending on the height.
__________________
I just read an article on heavy drinking - Scared the heck out of me! So that's it! After today ...... No more reading
|
|
|
|
|
|
#14 |
|
Member
Trade: Drywall & Plastering Contractor/DIY Seminar Speaker
Join Date: May 2008
Location: NE Ohio
Posts: 38
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
Not a firm beleiver in set pricing. There are so many variables and factors to consider like demand,time frame,level of quality they are seking etc, that it just seems unfair to even quote prices.....after all...a D-I-Yer might see it and use it as bible like they do the $10 a sheet thing......LMAOI sell the job as high as possible...... I offer discounts for various payment schedules......that's about it. Every now and than you get a check upfront because the contractor or home owner wants to save 10%.....good for me and good for him. I simply turn that around because I get a substantial material discount if I pay cash up front rather than 30 day net.
|
|
|
|
|
|
#15 |
|
Super Moderator
Trade: Drywall Contractor
Join Date: Oct 2008
Location: Northern MN
Posts: 951
Thanks: 9
Thanked 134 Times in 73 Posts
|
Re: Going rates.....
Is this price with the price of the sheetrock to?
|
|
|
|
|
|
#16 |
|
Super Moderator
Trade: Drywall Contractor
Join Date: Oct 2008
Location: Northern MN
Posts: 951
Thanks: 9
Thanked 134 Times in 73 Posts
|
Re: Going rates.....
I use to double up on anything over 8' well nobody knows how to build like that any more and then with 54' for 9' it seemed senseless and it also confused the contractor to much when he estimated the job.
|
|
|
|
|
|
#17 |
|
Member
Trade: Drywall-Plaster Contractor
Join Date: Jul 2008
Posts: 75
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
Michigan here hangers get 19-24 $2 stick for metal track. Finishers get .25 to .35 thats subs.Some hanger charged me 30 cent to hang 4000 feet and install 40 sticks of track. I got raped
|
|
|
|
|
|
#18 |
|
Member
Trade: Drywall & Plastering Contractor/DIY Seminar Speaker
Join Date: May 2008
Location: NE Ohio
Posts: 38
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
In my area no matter who you go to, so as long as they are legitimate, I've found that all of us land between $35 a sheet on 300 sheets or bigger, but as high as $60 a sheet on smaller projects. That cost includes material, install and finish to where it is ready for primer and paint.
When "mystery shopping", I found everyone in my area is about a dollar a sq ft. for all labor and materials, ((ready for primer)). The problem is, There are just so many variations ,it's hard to nail down sq footage cost. Some include clean up, some don;t. Some include a dumpster,some don't. Some square footage cost includes corner bead or high ceilings etc. Whenever someone calls me and asks for a phone quote I simpy tell them "ASSUMING this is a square box room, nothing custom, with 8 ft ceilings and no outside corners"......than I shoot them a base price. But I am quick to tell them that if there are outside corners, window corner bead, textures, closets etc.......that the price is not accurate. |
|
|
|
|
|
#19 |
|
Senior Member
Join Date: Dec 2007
Location: Northwest, NJ
Posts: 248
Thanks: 1
Thanked 11 Times in 7 Posts
|
Re: Going rates..... |
|
|
|
|
|
#20 |
|
Member
Trade: Drywall-Plaster Contractor
Join Date: Jul 2008
Posts: 75
Thanks: 0
Thanked 0 Times in 0 Posts
|
Re: Going rates.....
your gonna pay at least 95 to 1.00 a for a custom home. With white guys on the job no scabs all are goood at what they do.12' ceilings should be @ 1.20 but hard to get that know
|
|
|
|
![]() |
| Tags |
install sheetrock ![]() |
| Thread Tools | |
| Display Modes | |
|
|
| Go to Page... |
